No Videos available yet (Future outline)
Initial Setup
Jobsite – Getting Started
Locate control points
Set up Base Station
Set up Rover and SitePilot
Run GPS Base Setup program
Align to Site – shoot benchmarks
Benchmark recovery
Grade Mode
Verify existing condition
Check design grade/rough stake
Edit rod height – backpack or rover vehicle
Record topo data for progress volumes
Stake Mode
Staking/layout
Offsets and slope staking
Measure Mode
Quantify stockpiles
Measure lengths
Survey Mode
Create a new survey without a 3D model