Application Examples

Fort Ord Sitework Project

This series of videos demonstrates the procedures required to complete an earthwork and materials/underground takeoff on a subdivision

Fort Ord Sitework Project Part 1

Align PDF Sheets

Export Plan Sheets to KMZ File

Fort Ord Sitework Project Part 2

Vectorize PDF's

Clean-up Overlaps

Fort Ord Sitework Project Part 3

Assigning Elevations

Increment Snap (F8)

Fort Ord Sitework Project Part 4

Applying a Template

Entering Sectional Areas

Entering Stripping Areas

Fort Ord Sitework Project Part 5

Calculate Volumes

Generating Reports

Export KMZ File

Fort Ord Sitework Project Part 6

Entering Pipe Lines

Calculating Trench Volumes

Fort Ord Sitework Project Part 7

Importing Sitework File into Materials/Underground 4D

Assign Structures

Calculate Material Volumes

Calculate Trench Bedding, Backfill, Cover, Displacement

 

Wastewater Treatment Plant

This series of videos demonstrates the various procedures required to complete an earthwork takeoff on a Wastewater Treatment Plant

Wastewater Treatment Plant Overview

Wastewater Treatment Plants Part 1

Wastewater Treatment Plants Part 2

Wastewater Treatment Plants Part 3