Application Examples
This series of videos demonstrates the procedures required to complete an earthwork and materials/underground takeoff on a subdivision
Fort Ord Sitework Project Part 1
Align PDF Sheets
Export Plan Sheets to KMZ File
Fort Ord Sitework Project Part 2
Vectorize PDF's
Clean-up Overlaps
Fort Ord Sitework Project Part 3
Assigning Elevations
Increment Snap (F8)
Fort Ord Sitework Project Part 4
Applying a Template
Entering Sectional Areas
Entering Stripping Areas
Fort Ord Sitework Project Part 5
Calculate Volumes
Generating Reports
Export KMZ File
Fort Ord Sitework Project Part 6
Entering Pipe Lines
Calculating Trench Volumes
Fort Ord Sitework Project Part 7
Importing Sitework File into Materials/Underground 4D
Assign Structures
Calculate Material Volumes
Calculate Trench Bedding, Backfill, Cover, Displacement
This series of videos demonstrates the various procedures required to complete an earthwork takeoff on a Wastewater Treatment Plant
Wastewater Treatment Plant Overview
Wastewater Treatment Plants Part 1